Yildiz Entegre MDF Factory
Oarja, Romania
83,010 m²

Industrial · Găești, Dâmbovița, Romania · 2015
At the Arctic site in Găești (Dâmbovița county), Desco delivered two tasks in one contract in 2015: a material check-in building of 683 sqm and a waste water transport pipeline.
Buildings and pipelines follow different rules — here both had to be finished within three and a half months. That takes clearly separated construction stages, short building windows and planning that treats both trades as one task from the start.
The project shows our strength in industrial settings: even combined building and infrastructure tasks are delivered from one source, on schedule.